Description
A bridge inspection will be carried out using roped access.
Skippers should slow down when approaching the bridge.
Be prepared to stop (delays of less than 15 minutes may occur) whilst the roped access personnel move out of the way.
The main arch will be available from 11.00 onwards for all boats. Before 11.00, boats are advised to use one of the other arches if possible.
A safety boat will be directing river traffic.