Updates
19/06/2023 14:27
A QR code has been placed at the bridge which links to a video showing the correct way to open and close the bridge.
The charity making life better by water
Making life better by water
Starts: 5 May 2023 08:00 am
Ends: 18 November 2024 12:00 am inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Closest waterway | Leeds & Liverpool Canal |
Starts at | Bridge 218, Moss Swing Bridge |
Ends at | Bridge 218, Moss Swing Bridge |
A QR code has been placed at the bridge which links to a video showing the correct way to open and close the bridge.
Moss Swing Bridge is a third party owned swing bridge replacing the old third party owned swing bridge at this location.
The bridge is owned by Rodley Bridge Management Company with a 24hr number of 0800 0114 074
The bridge is manually operated via a gearing mechanism. It is important to follow the operating instructions displayed on site.
Failure to follow the instructions and fully open the bridge, via the handwheels, may result in damage to your boat.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration