Description
The lock by-weir culvert at Lock 4 is blocked and requires investigation and specialist cleaning to rectify. In order to do this, the water level below the lock will need to be dropped and the end of the culvert exposed, so the canal will be out of use during the day between Lock 3 and Lock 4.