Description
The temporary repair to the culvert included the placement of a weighted sheet on the canal bed and to help prevent the risk of this repair becoming damaged, we kindly ask that any boats navigating over the repaired section do so in neutral and drift over the sheet without operating the propeller.
This repaired section is approx 50m upstream of Lock 20E and is marked by orange fencing on both the offside and towpath side of the canal, in addition to sand bags.
We thank you for your support.