Skip to main content

The charity making life better by water

Boats advised of non operation of propellers 50m downstream from Lock 9 over repairs

Starts: 20 May 2022 12:00 pm

Ends: 21 May 2024 01:00 am inclusive

Type: Advice

Reason: Information

Is the towpath closed? No

Location

Closest waterwayHuddersfield Broad Canal
Starts atLock 9, Red Doles Lock
Ends atLock 8, Falls Lock

Updates

05/08/2022 13:31

Additional work has been undertaken on the temporary repair to the culvert and now includes the placement of a weighted sheet on the canal bed. To help prevent the risk of this repair becoming damaged, we kindly ask that any boats navigating over the repaired section do so in neutral and drift over the sheet without operating the propeller.

This repaired section is approx 50m downstream of Lock 9 and is marked by orange fencing on the towpath side of the canal.

We thank you for your support.

Description

Contractors have completed a temporary repair on the leak in this pound.

Due to the design of this repair, please ensure you are navigating in the middle of the channel in this pound and on the approach to the lock 9.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration