Description
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
The charity making life better by water
Making life better by water
Starts: 16 January 2023 08:00 am
Ends: 10 February 2023 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Chesterfield Canal |
Starts at | Lock 42, Shireoaks Top Lock |
Ends at | Lock 42, Shireoaks Top Lock |
Upstream winding hole | Turnerwood Bridge Winding Hole between Bridges 35 and 36 |
Downstream winding hole | Worksop Winding Hole below Bridge 41A, Sandy Lane Road Bridge |
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration