Description
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
The charity making life better by water
Making life better by water
Starts: 3 January 2023 08:00 am
Ends: 27 January 2023 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Rufford Branch (L&L Canal) |
Starts at | Lock 6, Chicken Lock, Baldwins Bridge |
Ends at | Lock 6, Chicken Lock, Baldwins Bridge |
Upstream winding hole | Junction with Leeds & Liverpool Canal |
Downstream winding hole | Winding Hole between Bridge 6 and 7 |
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration