Description
A stoppage is required to carry out bridge abutment repairs.
The charity making life better by water
Making life better by water
Starts: 7 November 2022 08:00 am
Ends: 2 December 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Peak Forest Canal |
Starts at | Bridge 22, Turf Lea Lift Bridge |
Ends at | Bridge 22, Turf Lea Lift Bridge |
Upstream winding hole | West of Br.28 New Mills or Br.38, Terminus of Canal at Whaley Basin |
Downstream winding hole | Above Lock 16 at Junction with Macclesfield canal. |
A stoppage is required to carry out bridge abutment repairs.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration