Skip to main content

The charity making life better by water

DLR Rail Bridge 7, Limehouse Cut.

Starts: 11 March 2023 08:00 am

Ends: 17 March 2023 04:00 pm inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? Yes

Location

Closest waterwayLimehouse Cut
Starts atBridge 6, Commercial Road (A13)
Ends atBridge 8, Ropemakers Field Footbridge
Upstream winding holeBow Lock, Bridge 1A, Bow Lock Crossover Bridge.
Downstream winding holeLimehouse Basin.

Description

A stoppage is required to carry out some remedial works on the arches to bridge strucutre. Safe system of work required to be dismantled - scaffolding over the river.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration