Starts: 4 July 2022 08:00 am

Ends: 15 July 2022 05:00 pm inclusive

Type: Towpath Closure

Reason: 3rd Party Works

Is the towpath closed? Yes

Location

Closest waterwayOxford Canal
Starts atBridge 164, Tom Rolt Bridge
Ends atBridge 164A, Footbridge

Updates

08/06/2022 14:53

Please note that the works planned have been delayed until the 4 July due to overrunning associated works with the third party.

The works are for upgrade of boater facilities between bridges 164 and 164a.

The mooring suspension will be in place for duration of works with towpath in place as required between 4 July 2022 (8:00am) until 15 July (17:00pm)

12/05/2022 12:44

Please be advised, due to a request from the Council, these works have been delayed by two weeks.

Description

Please be advised, due to the installation of 3 charging points, the towpath will be closed between bridge 164, and bridge 164A on the Oxford Canal.

The moorings will also be suspended for the duration of these works.