Tudor Embankment, between Stanley Lift Bridge and Well Bridge
Detail
From Date: 06/12/2021 08:00
To Date: 17/12/2021 16:00 inclusive
Type: Navigation Closure
Reason: Inspection
Is the towpath closed? Yes
Location
Closest waterway: Peak Forest Canal
Starts at: Bridge 1, Stanley Lift Bridge
Ends at: Bridge 3, Well Bridge
Upstream winding hole: PF-002-004 Well Bridge
Downstream winding hole: PF-001-002 - Portland Basin Stone Bridge
Description
A Stoppage is required to allow engineers to inspect the canal wall.