Culvert 9 Yelvertoft, Grand Union Canal, Leicester Arm
Detail
From Date: 15/11/2021 08:00
To Date: 17/12/2021 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? Yes
Location
Closest waterway: Leicester Line (Grand Union Canal)
Starts at: Culvert 8A
Ends at: Bridge 18, Yelvertoft Bridge
Upstream winding hole: Between bridges 14 and 15 near Cracks Hill Crick
Downstream winding hole: North of Bridge 28, Elkington Bridge
Description
A stoppage is required to carry out replacement of the culvert.
A leak into Culvert 9 has developed which has been secured temporarily in order to maintain navigation until the stoppage period when a permanent