Description
A stoppage is required to carry out some repair works.
Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
The charity making life better by water
Making life better by water
Starts: 24 January 2022 08:00 am
Ends: 11 February 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Llangollen Canal |
Starts at | Lock 2, Swanley Lock |
Ends at | Lock 2, Swanley Lock |
Upstream winding hole | Winding hole Between Bridges 10 and 12 |
Downstream winding hole | Winding hole Below bridge Bridge 96 on the Shropshire Union Canal |
A stoppage is required to carry out some repair works.
Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration