Bridge 219, Shipton Lift Bridge, Oxford Canal
Detail
From Date: 10/01/2022 08:00
To Date: 11/03/2022 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Oxford Canal
Starts at: Bridge 219, Shipton Lift Bridge
Ends at: Bridge 219, Shipton Lift Bridge
Upstream winding hole: Between Bridge 215 (Caravan Lift Bridge) and Bridge 215A (Railway)
Downstream winding hole: Bridge 221, Thrupp Wide
Description
A stoppage is required in order for the lift bridge to be replaced and to carry out brickwork repairs.