Skip to main content

The charity making life better by water

Bridge 219, Shipton Lift Bridge, Oxford Canal

Starts: 10 January 2022 08:00 am

Ends: 11 March 2022 04:00 pm inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? No

Location

Closest waterwayOxford Canal
Starts atBridge 219, Shipton Lift Bridge
Ends atBridge 219, Shipton Lift Bridge
Upstream winding holeBetween Bridge 215 (Caravan Lift Bridge) and Bridge 215A (Railway)
Downstream winding holeBridge 221, Thrupp Wide

Description

A stoppage is required in order for the lift bridge to be replaced and to carry out brickwork repairs.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration