Description
A stoppage is required to carry out waterway wall rebuild.
The charity making life better by water
Making life better by water
Starts: 14 February 2022 08:00 am
Ends: 25 March 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Caldon Canal |
Upstream winding hole | Endon Basin |
Downstream winding hole | Winding Hole. Foxley |
A stoppage is required to carry out waterway wall rebuild.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration