Description
A stoppage is require to carry out repairs to the bottom gate heel post.
The charity making life better by water
Making life better by water
Starts: 8 November 2021 08:00 am
Ends: 19 November 2021 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | River Soar |
Starts at | Lock 48 Cossington Lock |
Ends at | Lock 48 Cossington Lock |
Upstream winding hole | Most craft should be able to turn round either side of the lock with it being on the river soar |
Downstream winding hole | Most craft should be able to turn round either side of the lock with it being on the river soar |
A stoppage is require to carry out repairs to the bottom gate heel post.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration