Description
A stoppage is required to put resin grouting behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
The charity making life better by water
Making life better by water
Starts: 10 January 2022 08:00 am
Ends: 28 January 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Caldon Canal |
Starts at | Lock 6 Fenns Lock |
Ends at | Lock 6 Fenns Lock |
Upstream winding hole | Hazelhurst, between Bridges 33 and 34 |
Downstream winding hole | Foxley, between Bridge 18 and 16A |
A stoppage is required to put resin grouting behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration