Description
A stoppage is required for wet abutment and channel repairs.
The charity making life better by water
Making life better by water
Starts: 8 November 2021 08:00 am
Ends: 17 December 2021 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Monmouthshire & Brecon Canal |
Starts at | Bridge No. 103 Navigation |
Ends at | Bridge 106, Ffynnon-Yr-Eirin |
Upstream winding hole | Windy Corner Bridge 109 |
Downstream winding hole | Between Bridges 101 and 102 |
A stoppage is required for wet abutment and channel repairs.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration