Skip to main content

The charity making life better by water

Cawood Bridge River Ouse Downstream Approach

Starts: 12 March 2021 09:45 am

Ends: 30 April 2021 11:00 pm inclusive

Type: Advice

Reason: Maintenance

Is the towpath closed? No

Location

Closest waterwayRiver Ouse
Starts atCawood Bridge
Ends atCawood Bridge

Description

Skippers of all craft planning passage on the River Ouse should be aware. The emergency waiting point on the downstream approach to Cawood Bridge is presently unavailable. The Trust is working with the bridge owner to repair the waiting point as soon as circumstances permit.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration