Scaffolding installation Dockside at Kings Bridge Court, Millwall Outer Dock

Detail

From Date: 10/02/2021 07:00

To Date: 02/06/2021 18:00 inclusive

Type: Advice

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Millwall Outer Dock

Description

Contractor will be installing scaffolding adjacent Kings Bridge Court for the external refurbishment of the Dockside elevation at Millwall Outer Dock.

During installation/dismantling process the Dockside will be managed by Marshal’s either side with barriers to protect pedestrians.

Advanced warning signage will be displayed on site during the works.