Description
Contractor will be installing scaffolding adjacent Kings Bridge Court for the external refurbishment of the Dockside elevation at Millwall Outer Dock.
During installation/dismantling process the Dockside will be managed by Marshal's either side with barriers to protect pedestrians.
Advanced warning signage will be displayed on site during the works.