Description
A stoppage is required to carry out works to reduce leakage at Lock 15. This will include relining of the top lock gates and refurbishment of the cills.
The stoppage is timed to coincide with other closures in the area.
The charity making life better by water
Making life better by water
Starts: 22 February 2021 08:00 am
Ends: 26 February 2021 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Kennet & Avon Canal |
Starts at | Lock 16, Harris Lock |
Ends at | Bridge 159 (Footbridge) |
Upstream winding hole | Devizes Wharf, above Lock 50 Top Lock. |
Downstream winding hole | Between Bridge 179 and 181, Claverton. |
A stoppage is required to carry out works to reduce leakage at Lock 15. This will include relining of the top lock gates and refurbishment of the cills.
The stoppage is timed to coincide with other closures in the area.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration