Skip to main content

The charity making life better by water

Bridge 238B to Bridge 239A Oxford Canal

Starts: 25 August 2020 07:00 pm

Ends: 7 September 2020 04:28 pm inclusive

Type: Navigation Closure

Reason: Vegetation

Is the towpath closed? Yes

Location

Closest waterwayOxford Canal
Starts atBridge 238B, Unipart Bridge
Ends atBridge 239A, Frenchay Bridge

Updates

07/09/2020 16:28

Windblown tree clearedNavigation and towpath open

Description

Wind blown tree blocking towpath and navigation

Tree will be cleared as soon as possible

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration