Skip to main content

The charity making life better by water

Canning River Entrance Gate, Liverpool Dock

Starts: 23 December 2019 12:00 am

Ends: 30 June 2020 05:00 pm inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? No

Location

Closest waterwayLiverpool Link
Starts atCanning River Swing Bridge
Ends atCanning River Swing Bridge

Updates

31/03/2020 15:40

Please note these works have been extended to 30 June 2020

25/02/2020 09:35

Please note these works have been extended to 31 March 2020.

24/01/2020 09:54

Please note these works have been extended to 29 February 2020.

Description

A recent dive inspection on Canning River Entrance Gate has identified a number of defects on the main gate hinge pivot points.

Repairs have been planned for early January 2020 in order to rectify the defects. Until these repairs have been carried out the river gate must remain in the closed position.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration