Skip to main content

The charity making life better by water

Lock 1 Sawley Flood Lock, Upper Trent

Starts: 13 January 2020 08:00 am

Ends: 31 January 2020 04:00 pm inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? No

Location

Closest waterwayUpper Trent
Starts atLock 1 Sawley Flood Lock
Ends atLock 1 Sawley Flood Lock
Upstream winding holeShardlow, between Bridges 2 and 2A
Downstream winding holeJunction with the Erewash Canal

Description

A closure is required to carry out repairs to the bottom gates and balance beams.

Please note the new end date for this closure.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration