Description
Lock 14: Replacement of the tail gate.
Lock 8: Carry out repairs to brickwork and the lock landing.
The charity making life better by water
Making life better by water
Starts: 4 November 2019 08:00 am
Ends: 13 December 2019 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Ashton Canal |
Starts at | Lock 18 |
Ends at | Lock 2 |
Upstream winding hole | Above Lock 18 Ashton canal |
Downstream winding hole | Between Locks 1 and 2 Ashton canal |
Lock 14: Replacement of the tail gate.
Lock 8: Carry out repairs to brickwork and the lock landing.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration