Description
An extensive lock wall rebuild is required to restore the navigable width of the lock chamber.
The navigation will be dewatered, the existing lock wall will be dismantled, re-constructed and reinstated to its previous alignment.
The charity making life better by water
Making life better by water
Starts: 4 November 2019 08:00 am
Ends: 27 March 2020 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? Yes
Closest waterway | Llangollen Canal |
Starts at | Lock 4, Hurleston Locks |
Ends at | Lock 1, Hurleston Locks |
Upstream winding hole | Between Bridges 10 and 11. |
Downstream winding hole | Junction of Shropshire Union Canal, by Lock 4. |
An extensive lock wall rebuild is required to restore the navigable width of the lock chamber.
The navigation will be dewatered, the existing lock wall will be dismantled, re-constructed and reinstated to its previous alignment.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration