Bridge 15, Methodist Swing Bridge, Maghull , Leeds & Liverpool Canal

Detail

From Date: 06/01/2020 08:00

To Date: 28/02/2020 16:00 inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? Yes

Location

Closest waterway: Leeds & Liverpool Canal

Starts at: Bridge 15, Methodist Swing Bridge

Ends at: Bridge 15, Methodist Swing Bridge

Upstream winding hole: Between Bridges 17 and 16

Downstream winding hole: Between Bridge 11 and 10

Description

Replacement hydraulic system. Installation of drop arm automated barriers and wig-wag signals.