Description
The navigation will be dewatered to allow channel investigations throughout the length and to undertake multiple leakage repairs in both hard and soft banks.
The charity making life better by water
Making life better by water
Starts: 2 January 2020 08:00 am
Ends: 13 March 2020 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Monmouthshire & Brecon Canal |
Starts at | Bridge 106, Ffynnon-Yr-Eirin |
Ends at | Bridge 110, Pen-Pedair-Heol |
Upstream winding hole | Llangattock Wharf, between Bridges 115 and 11 |
Downstream winding hole | Gilwern, between Bridges 104 and 103 |
The navigation will be dewatered to allow channel investigations throughout the length and to undertake multiple leakage repairs in both hard and soft banks.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration