Bridge 29, Kinver Water Pipe Bridge and Lock 11 Kinver Lock, Staffordshire & Worcestershire Canal

Detail

From Date: 17/02/2020 08:00

To Date: 13/03/2020 16:00 inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? Yes

Location

Closest waterway: Staffordshire & Worcestershire Canal

Starts at: Bridge 29, Kinver Bridge

Ends at: Lock 11 Kinver Lock

Upstream winding hole: Between Bridge 30 and Hyde Lock near Bratch (Hyde)

Downstream winding hole: Between Bridge 29 and Bridge 28

Description

Lock 11, Kinver Lock:   Carry out gate replacement and repairs, chamber brickwork repairs, quadrant and ladder works.

Kinver Water Pipe Bridge, Bridge 29:   Third party contractors, Alfred Bagnell & Sons, will be grit blasting and repainting a gas main.  An encapsulated scaffolding is to be erected across the navigation and towpath.