Description
A stoppage is required for third party contractors, on behalf of the Council, to carry out an extension of the bridge and to re-build the parapet.
The charity making life better by water
Making life better by water
Starts: 10 February 2020 08:00 am
Ends: 13 March 2020 04:00 pm inclusive
Type: Navigation Closure
Reason: 3rd Party Works
Is the towpath closed? Yes
Closest waterway | Rochdale Canal |
Starts at | Bridge 25, Shaw Wood Bridge |
Ends at | Bridge 25, Shaw Wood Bridge |
Upstream winding hole | At Bridge 30, Lock 19 |
Downstream winding hole | Bridge 24, Stoodely Bridge |
A stoppage is required for third party contractors, on behalf of the Council, to carry out an extension of the bridge and to re-build the parapet.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration