Updates
10/04/2024 16:43
We are pleased to advise the repair to Bridge Bridge 49, Royal Oak Swing Bridge, on the Macclesfield Canal has been successful and navigation has resumed.
The charity making life better by water
Making life better by water
Starts: 10 April 2024 09:00 am
Ends: 10 April 2024 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Macclesfield Canal |
Starts at | Bridge 49, Royal Oak Swingbridge |
Ends at | Bridge 49, Royal Oak Swingbridge |
We are pleased to advise the repair to Bridge Bridge 49, Royal Oak Swing Bridge, on the Macclesfield Canal has been successful and navigation has resumed.
Please be advised navigation is currently closed at bridge 49, on the Macclesfield Canal due to a fault with the hydraulic hose that operates the bridge.
Our contractors have been informed and they will be on site today.
An update will be provided this afternoon.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration