Crown Point Bridge Inspection
Detail
From Date: 29/09/2016 08:00
To Date: 30/09/2016 17:30 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Crown Point Bridge
Ends at: Crown Point Bridge
Description
Contractors (Total Access) are carrying out bridge inspection works using roped access techniques. All boat traffic should take care when passing and abide by the contractors advice, this may result in delays of no longer than 15-20 minutes.
Please slow down when approaching Crown Point bridge and be prepared to stop if requested.
For further information please call 0303 0404040