Bridge 108A
Detail
From Date: 15/09/2016 00:00
To Date: 15/09/2016 23:59 inclusive
Type: Navigation Closure
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Leicester Line (Grand Union Canal)
Starts at: Bridge 108A
Ends at: Bridge 108A
Description
VHE Construction plc on behalf of National Grid will be placing a temporary bridge across the navigation approximately 10 meters north west of Bridge 108A to facilitate the transport of material from the gas holder’s demolition.
This will commence at 4pm and end at 11pm.
The Navigation will be closed for the duration.
Towpath will be closed, but there will be a temporary diversion in place at the rear.