Description
A stoppage is required to carry out repair works to erosion under the towpath and the headwall.
The charity making life better by water
Making life better by water
Starts: 7 November 2022 08:00 am
Ends: 23 December 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? Yes
Closest waterway | River Soar |
Upstream winding hole | Winding Hole, nr. Br. 98 (Glen Parva). |
Downstream winding hole | Winding Hole, Pillings. D/S of Lock 52 Bottom Gate. |
A stoppage is required to carry out repair works to erosion under the towpath and the headwall.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration