Skip to main content

The charity making life better by water

Bridge Strike - Wolvercote Lift Bridge (Bridge 234)

Starts: 3 June 2021 02:00 pm

Ends: 8 June 2021 12:00 am inclusive

Type: Navigation Closure

Reason: Boat damage

Is the towpath closed? No

Location

Closest waterwayOxford Canal
Starts atBridge 233, Wolvercote Lift Bridge
Ends atBridge 233, Wolvercote Lift Bridge

Description

Due to a suspected bridge strike and damage to the bridge by a third party, we require the bridge to remain in the down position until our Engineers have inspected
this fully.

photo of a location on the canals
newsletter logo

Stay connected

Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration