Mooring suspension and towpath closure, Bridge 28a, Lee Navigation
Detail
From Date: 03/09/2019 00:00
To Date: 31/03/2020 23:59 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Lee Navigation
Starts at: Bridge 28A
Ends at: Bridge 28A
Description
North London Waste Authority Contractor to replace the existing Bridge 28A bearings, Lee Park Way, Edmonton.
The Towpath will need to be closed to facilitate these works and floating walkway installed within navigation to divert pedestrians onto. Hoarding will be installed to protect the public during the works.
Moored Boats on both sides will need to be relocated to another location.