Goole Railway Bridge - Survey
Detail
From Date: 18/03/2019 08:00
To Date: 30/03/2019 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: River Ouse
Starts at: Goole Railway Bridge
Ends at: Goole Railway Bridge
Updates
07/03/2019 09:05
Network Rail will be conducting a visual survey of the rail bridge from a floating pontoon.
Further details and instructions to be issued at a later date.
Description
Network Rail will be conducting a visual survey of the rail bridge from a floating pontoon.
Boater may be delayed up to 15 minutes. Please slow down on approach to bridge.