Towpath diversion for retaining wall repair, South of Bridge 242, Walton Well Road Bridge, Oxford Canal
Detail
From Date: 08/04/2019 00:00
To Date: 10/05/2019 23:59 inclusive
Type: Towpath Closure
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Oxford Canal
Starts at: Bridge 242, Walton Well Road
Ends at: Bridge 242, Walton Well Road
Description
Towpath diversion for repairs to William Lucy Way retaining wall, South of Bridge 242, Walton Well Road Bridge, Oxford Canal
Contractors will be undertaking works to restore the structural integrity of the masonry wall where cracking and leaning has occurred.
The towpath will be closed and a short diversion would be in place to direct pedestrians around the works.
The canal navigation will be unaffected by the works