From Fishpond to Woodlesford lock

Notice Details
From Date:
1st October 2018 at 08:00
To Date:
3rd December 2018 at 16:00 inclusive
Type:
Towpath Closure
Reason:
Maintenance
Description:

The towpath between Fishponds Lock and Woodlesford Lock is to be closed during October and November 2018 as a result of dredging works on the Aire & Calder Navigation.

The silt from the dredging is to be offloaded to Woodlesford Tip, this offloading will involve excavators reaching over the towpath, therefore in the interest of public safety the towpath will be closed for the duration of the works.

Whilst these works are being carried out pedestrians using the towpath will be able to cross over at the locks and use the path on the opposite side

Location:
Aire & Calder Navigation Main Line
Starts At:
Lock 4, Fishpond Lock
Ends At:
Lock 5, Woodlesford Lock
Search again

Notice Location