Between Bridge 5 Victoria Bridge (College Road) and Bridge 6 Cauldon Road (on the Cauldon Canal)

Notice Details
From Date:
22nd January 2018 at 08:00
To Date:
23rd March 2018 at 17:00 inclusive
Type:
Navigation Restriction
Reason:
3rd Party Works
Is Towpath Closed?
Yes
Notice updates:
16/03/2018 @ 10:34

Third party contractors will be carrying out repairs to bridges 5A and 5B at Hanley Park. Access will be via temporary scaffolds and a pontoon in the waterway.

Warning signs and banksmen will be used. Please approach with caution and be prepared to stop if requested.

Description:

Third party contractors will be carrying out repairs to bridges 5A and 5B at Hanley Park. The towpath will be closed and a diversion route will be provided through the park.

Warning signs and banksmen will be used. Please approach with caution and be prepared to stop if requested

 

Location:
Caldon Canal
Starts At:
Bridge 5 Victoria Bridge, College Rd
Ends At:
Bridge 6 Caldon Road
Search again

Notice Location