Caldon canal- bridge 53 and Froghall Tunnel

Notice Details
From Date:
22nd January 2018 at 07:30
To Date:
2nd March 2018 at 17:00 inclusive
Type:
Navigation Closure
Reason:
3rd Party Works
Is Towpath Closed?
Yes
Description:

Third party contractors will be carrying out maintenance to pipe bridges over the canal. The canal and towpath will be restricted due to the use of temporary scaffolds.

A minimum of 2.2m clearance (above water level) will be retained (NB - the canal and towpath are already closed nearby for bridge works). Any traffic should slow down, approach with caution and be prepared to stop if requested.  Banksmen and warning signs will be in place.

Location:
Caldon Canal
Starts At:
Bridge 53, Cherryeye Bridge
Ends At:
Froghall Tunnel
Search again

Notice Location