Rhodesfield Lock
Detail
From Date: 25/09/2017 07:00
To Date: 29/09/2017 17:00 inclusive
Type: Navigation Restriction
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Ripon Canal
Starts at: Lock 1 / Rhodesfield Lock
Ends at: Lock 1 / Rhodesfield Lock
Description
Repairs are being carried out on leaking fenders at Rhodesfield Lock.
Work will be carried out from a workboat in the lock.
Can skippers of all craft slow down and approach with care.
Passage through the lock will be possible but delays of up to one hour can be expected to remove equipment from the area.