Grand Union, Bridge 190B

Notice Details
From Date:
20th September 2017 at 08:00
To Date:
30th October 2017 at 18:00 inclusive
Type:
Navigation Restriction
Reason:
Maintenance
Notice updates:
15/09/2017 @ 14:37

Due to the bridge strengthening works at 190B, the navigation under the bridge will be restricted between 8.00am- 5.00pm, allowing only one boat 4m wide passage at any time.

During these times the walkway over the bridge will also be closed and a diversion route will be through Packet boat Marina

17/08/2017 @ 11:34

Due to the bridge strengthening works at 190B, the navigation under the bridge will be restricted between 8.00am- 5.00pm, allowing only one boat 4m wide passage at any time.

During these times the walkway over the bridge will also be closed and a diversion route will be through Packet boat Marina

Description:

Due to the bridge strengthening works at 190B, the navigation under the bridge will be closed form 8.00am- 5.00pm and opened thereafter, the diversion route will be through Packet boat Marina

Location:
Grand Union Canal
Starts At:
Bridge 190B (Roving Bridge)
Ends At:
Bridge 190B (Roving Bridge)
Search again

Notice Location