Railway Bridge 9 diving survey

Detail

From Date: 19/12/2016 08:00

To Date: 20/12/2016 17:00 inclusive

Type: Advice

Reason: Information

Is the towpath closed? No

Location

Closest waterway: Wakefield Branch (Aire & Calder Nav)

Starts at: Bridge 9, Railway (Disused)

Ends at: Bridge 9, Railway (Disused)

Updates

20/12/2016 16:18

We have been advised that these works have been completed.

Description

Contractors are carrying out bridge survey works at Railway bridge 9, this will include access to the water to enable all elements to be inspected.


The canal will be restricted at this location due to divers in the canal.  All boat traffic should slow down when approaching and passing the bridge and be prepared to stop if requested.   This may result in delay of no longer than 15-20 minutes.

Please abide by the contractors advice.

For further information please call 0303 0404040.