Acton Bridge
Detail
From Date: 14/11/2016 08:00
To Date: 25/11/2016 17:00 inclusive
Type: Navigation Restriction
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Weaver Navigation
Starts at: Acton Swing Bridge
Ends at: Acton Swing Bridge
Description
Emergency works are required to replace several cracked roller bearings on Acton Swing Bridge. It will not be possible to swing the bridge during these works and a restriction to air draft of 3.9m will be in place until the works are completed.