Yarm Bridge Inspection

Detail

From Date: 23/11/2016 08:00

To Date: 02/12/2016 17:30 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Tees Navigation

Starts at: Yarm Road Bridge

Ends at: Yarm Road Bridge

Updates

23/11/2016 09:13

The drone and under bridge inspections will be taking place from the 23rd -25th of November. The diving works will commence 28th of November to 2nd of December.

22/11/2016 14:09

The contractor has informed us that the diving works could not be undertaken as planned due to adverse weather conditions.

In case of more bad weather, these works have now been rearranged to be carried out during a window when the river levels will be lower between Monday 28 November to Friday 2 December.

14/11/2016 10:12

Please note the Contractor will also be undertaking an evening inspection on the 23rd November using a underbridge unit from 7pm until 5am.

All boat traffic should slow down and take care when passing and abide by the contractors advice, this may result in delays of no longer than 15-20 minutes.

Description

Contractors (Atkins) are carrying out an underwater bridge inspection using divers at Yarm Road Bridge.

All boat traffic should slow down and take care when passing and abide by the contractors advice, this may result in delays of no longer than 15-20 minutes.

For further information please call 0303 040 4040.