Goole Swing Bridge Diving Inspection
Detail
From Date: 08/11/2016 08:00
To Date: 10/11/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: River Ouse
Starts at: Goole Railway Bridge
Ends at: Goole Railway Bridge
Description
Contractors (Xeiad) are carrying out bridge inspection works including access to the water to enable all elements to be inspected.
The watercourse will be restricted at this location due to divers in water. All boat traffic should take caution when passing and abide by the contractors advice, this may result in a delay of no longer than 15-20 minutes
Please slow down when approaching bridge and be prepared to stop if requested.