From Date: 18/08/2016 08:00
To Date: 18/08/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Closest waterway: Leeds & Liverpool Canal
Starts at: Bridge 130B, Manchester Road Bridge
Ends at: Bridge 130B, Manchester Road Bridge
Please be advised that contractors are removing a gas main off the side of the bridge
Please slow down when approaching the bridge and be prepared to stop if requested.