Bridge 23A
Detail
From Date: 30/08/2016 08:00
To Date: 01/09/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Erewash Canal
Starts at: Bridge 23A
Ends at: Bridge 23A
Description
Contractors (Dyer & Butler) are carrying out bridge repairs under the Bridge.
The canal will be restricted at this location due to the use of a floating pontoon.
All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested.
Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.