Wellington Bridge, 225D
Detail
From Date: 05/09/2016 08:00
To Date: 06/09/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Leeds & Liverpool Canal
Starts at: Bridge 225D, Wellington Road Bridge
Ends at: Bridge 225D, Wellington Road Bridge
Description
Please be advised that Leeds City Council are carrying out bridge repair works using board walks. The watercourse will be restricted at this location due to the board walks underneath the bridge. The boards are able to be removed from the watercourse within 5 minutes to allow vessels to pass through. All boat traffic should take caution when passing and abide by the contractors advice.
Please slow down when approaching bridge and be prepared to stop if requested. Delays not exceeding 15-20 minutes.